|
Community Development Department, Engineering Permits and Records Division |
|
FEES EFFECTIVE JULY 1, 2008 TO JUNE 30, 2009 |
|
|
|
|
|
|
|
Minimum Dollar Amounts |
|
|
Description |
Fees |
|
Permit |
$39.00 |
|
Inspection |
$73.00 |
|
Mapping (5% of inspection ) or |
$10.00 |
|
Deposits |
$500.00 |
|
Investigation |
$73.00 |
|
Tract Billing per hour |
$130.00 |
|
|
|
|
|
|
|
Construction and Excavation Permit Fees |
|
|
Description |
Inspection |
|
P. C. C. Curb and Gutter |
$1.22 |
per lin. ft. |
|
A. C. Berm |
$1.22 |
per lin. ft. |
|
P. C. C. Sidewalk |
$0.36 |
per lin. ft. |
|
Drive Approach |
$0.36 |
per lin. ft. |
|
P. C. C. Pavement |
$0.36 |
per lin. ft. |
|
Spandrels and Cross Gutters |
$0.36 |
per lin. ft. |
|
A. C. Pavement (with base) |
$0.36 |
per lin. ft. |
|
Earth Surfaces (grading) |
$0.25 |
per lin. ft. |
|
Permanent Barricades |
$73.00 |
ea. |
|
Trenching |
|
|
<5' deep |
$1.22 |
per lin. ft. |
|
>5' deep (Shoring required) |
$1.47 |
per lin. ft. |
|
Connect to Existing Sewer |
$147.00 |
ea. |
|
Construct Manhole |
$147.00 |
ea. |
|
Adjust Existing Manhole to Grade |
$73.00 |
ea. |
|
Construct Catch basin |
$147.00 |
ea. |
|
Construct Parkway Drain each |
$86.00 |
ea. |
|
Construct Curb Drain |
$86.00 |
ea. |
|
|
|
|
|
|
|
Minimum Deposits |
|
|
Sewer Lateral to Main line |
$500.00 |
|
Asphaltic or P. C. C. Surfaces |
$100.00 |
|
Gunite in Public Right of Way |
N/A |
|
Scaffolding on Wheels in ROW |
$300.00 |
|
|
|
|
|
|
|
Special Considerations |
|
|
Street use permit fee (oversize or overweight loads) |
$26.00 |
|
Refuse Receptacle Permit Fee |
$39.00 |
|
Refuse Receptacle Inspection Fee |
$73.00 |
|
Refuse Receptacle Deposit |
$200.00 |
|
|
|
|
|
|
|
Miscellaneous fees |
|
|
Encroachment permit |
$100.00 |
|
Street vacation - summary |
$1,466.00 |
|
Street vacation - Public Hearing |
$2,199.00 |
|
License Agreement for Monitoring Wells |
$489.00 |
|
each additional well |
$61.00 |
|
Application for street naming |
$855.00 |
|
Application for street naming change |
$1,466.00 |
|
|
|
|
|
|
|
Plan Check Process |
|
|
Plan check of City Standard sheets |
6.0% |
|
Per Sheet |
|