Crenshaw Rehabilitation (182nd St. to 190th St.), T-22

Engineering Manager: Craig Bilezerian, P.E.
Project Engineer: Davina Buenavista


Description:
This project will construct roadway improvements to Crenshaw Boulevard between 182nd Street and 190th Street.

Project Status
Currently in the design phase.  The design phase should be completed by January, 2010.

Agency Contact
For questions about this project, please contact either Craig Bilezerian or Davina Buenavista at (310) 781-6900 or by e-mail at DBuenavista@TorranceCA.gov.

Click here for the Project Location Map (pdf).